400 KWp Grid Connected Solar Power System at Building, CPWD Kasturba Nagar New Delhi(Phase-I)
Design,Supply, Installation, Testing and Commissioning of 400 KWp Grid Connected Solar Power System at “Redevelopment of General Pool Residential colony at Building, CPWD, Kasturba Nagar New Delhi-110003(Phase-I)
Project Details
Client
ITD Cementation India Limited
Location
Kasturba Nagar New Delhi-110003
Capacity
400 KWp
Category
residential
Call Now